Sanitary Sewer Model Update and Risk Assessment
In January of 2024 Dillon Consulting submitted their completed Sanitary Model Recalibration and Basement Flood Risk Mitigation Study. This updated model will provide insight into the existing flow characteristics of the sanitary sewer system and on available sanitary sewer capacity to accommodate infill development within the Town.
Related Documents
Report PWES-2018-08 PWES 2019-2023 Capital Works Plan
Report PWES-2018-17 Flood Mitigation Strategy